{"id":38223,"date":"2026-01-14T12:49:00","date_gmt":"2026-01-14T10:49:00","guid":{"rendered":"https:\/\/nitrainvest.sk\/en\/?p=38223"},"modified":"2026-01-26T12:51:58","modified_gmt":"2026-01-26T10:51:58","slug":"%f0%9f%a7%b1-we-are-expanding-administrative-spaces-in-hall-s","status":"publish","type":"post","link":"http:\/\/nitrainvest.sk\/en\/uncategorized\/%f0%9f%a7%b1-we-are-expanding-administrative-spaces-in-hall-s\/","title":{"rendered":"\ud83e\uddf1 We are expanding administrative spaces in Hall S"},"content":{"rendered":"\n<p>In the Nitra-Sever Industrial Park, we continue to expand the administrative premises in Hall S for our long-term client.<\/p>\n\n\n\n<p>The project includes the construction of 200 m\u00b2 of new office space, which is custom-designed according to the client&#8217;s operational needs &#8211; from the layout to the technical equipment and interior standards.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" width=\"1024\" height=\"766\" src=\"http:\/\/nitrainvest.sk\/wp-content\/uploads\/Snimka-obrazovky-2026-01-14-o-13.16.46-1024x766.png\" alt=\"\" class=\"wp-image-38204\" srcset=\"http:\/\/nitrainvest.sk\/wp-content\/uploads\/Snimka-obrazovky-2026-01-14-o-13.16.46-1024x766.png 1024w, http:\/\/nitrainvest.sk\/wp-content\/uploads\/Snimka-obrazovky-2026-01-14-o-13.16.46-300x224.png 300w, http:\/\/nitrainvest.sk\/wp-content\/uploads\/Snimka-obrazovky-2026-01-14-o-13.16.46-600x449.png 600w, http:\/\/nitrainvest.sk\/wp-content\/uploads\/Snimka-obrazovky-2026-01-14-o-13.16.46.png 1285w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>The aim of the project is to create a modern, functional and energy-efficient administrative environment that will support the comfort and productivity of employees. The renovations focus on quality materials, lighting comfort and optimal use of space.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" width=\"1024\" height=\"769\" src=\"http:\/\/nitrainvest.sk\/wp-content\/uploads\/Snimka-obrazovky-2026-01-14-o-13.17.02-1024x769.png\" alt=\"\" class=\"wp-image-38203\" srcset=\"http:\/\/nitrainvest.sk\/wp-content\/uploads\/Snimka-obrazovky-2026-01-14-o-13.17.02-1024x769.png 1024w, http:\/\/nitrainvest.sk\/wp-content\/uploads\/Snimka-obrazovky-2026-01-14-o-13.17.02-300x225.png 300w, http:\/\/nitrainvest.sk\/wp-content\/uploads\/Snimka-obrazovky-2026-01-14-o-13.17.02-600x451.png 600w, http:\/\/nitrainvest.sk\/wp-content\/uploads\/Snimka-obrazovky-2026-01-14-o-13.17.02.png 1285w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>The project will take approximately 2 to 3 months to complete, with the premises scheduled for handover in March 2026.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In the Nitra-Sever Industrial Park, we continue to expand the administrative premises in Hall S for our long-term client. The project includes the construction of 200 m\u00b2 of new office space, which is custom-designed according to the client&#8217;s operational needs &#8211; from the layout to the technical equipment and interior standards. The aim of the&hellip;<\/p>\n","protected":false},"author":3,"featured_media":38204,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[76],"tags":[],"aioseo_notices":[],"_links":{"self":[{"href":"http:\/\/nitrainvest.sk\/en\/wp-json\/wp\/v2\/posts\/38223"}],"collection":[{"href":"http:\/\/nitrainvest.sk\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/nitrainvest.sk\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/nitrainvest.sk\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"http:\/\/nitrainvest.sk\/en\/wp-json\/wp\/v2\/comments?post=38223"}],"version-history":[{"count":1,"href":"http:\/\/nitrainvest.sk\/en\/wp-json\/wp\/v2\/posts\/38223\/revisions"}],"predecessor-version":[{"id":38224,"href":"http:\/\/nitrainvest.sk\/en\/wp-json\/wp\/v2\/posts\/38223\/revisions\/38224"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/nitrainvest.sk\/en\/wp-json\/wp\/v2\/media\/38204"}],"wp:attachment":[{"href":"http:\/\/nitrainvest.sk\/en\/wp-json\/wp\/v2\/media?parent=38223"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/nitrainvest.sk\/en\/wp-json\/wp\/v2\/categories?post=38223"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/nitrainvest.sk\/en\/wp-json\/wp\/v2\/tags?post=38223"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}