{"id":37894,"date":"2024-11-11T13:45:00","date_gmt":"2024-11-11T11:45:00","guid":{"rendered":"https:\/\/nitrainvest.sk\/en\/uncategorized\/betonaz-spevnenych-ploch\/"},"modified":"2025-03-10T09:46:05","modified_gmt":"2025-03-10T07:46:05","slug":"betonaz-spevnenych-ploch","status":"publish","type":"post","link":"http:\/\/nitrainvest.sk\/en\/uncategorized\/betonaz-spevnenych-ploch\/","title":{"rendered":"Concreting of paved areas"},"content":{"rendered":"\n<p>We are in the final phase of the implementation of the Production and Storage Hall S, where the last paved areas are currently being concreted. This key stage will provide a stable and durable surface that will be used for efficient material handling and ensure smooth logistics throughout the space.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" width=\"1024\" height=\"768\" src=\"https:\/\/nitrainvest.sk\/wp-content\/uploads\/480503397_122237472836024777_2311550917011718341_n-1024x768.jpg\" alt=\"\" class=\"wp-image-37819\" srcset=\"http:\/\/nitrainvest.sk\/wp-content\/uploads\/480503397_122237472836024777_2311550917011718341_n-1024x768.jpg 1024w, http:\/\/nitrainvest.sk\/wp-content\/uploads\/480503397_122237472836024777_2311550917011718341_n-300x225.jpg 300w, http:\/\/nitrainvest.sk\/wp-content\/uploads\/480503397_122237472836024777_2311550917011718341_n-1536x1152.jpg 1536w, http:\/\/nitrainvest.sk\/wp-content\/uploads\/480503397_122237472836024777_2311550917011718341_n-600x450.jpg 600w, http:\/\/nitrainvest.sk\/wp-content\/uploads\/480503397_122237472836024777_2311550917011718341_n.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>The paved areas are designed to meet the highest technical standards, take into account the demands of future tenants and at the same time withstand intensive loads in the long term. During <a href=\"http:\/\/www.vendastav.sk\" target=\"_blank\" rel=\"noopener\">construction<\/a>, we are guided by high quality and efficiency criteria in order to provide our clients with modern and functional spaces for their business.<\/p>\n\n\n\n<p>We are looking forward to putting the finishing touches on the space and being able to hand it over for use soon. Stay tuned for more news from our development projects!<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" width=\"1024\" height=\"768\" src=\"http:\/\/nitrainvest.sk\/wp-content\/uploads\/480650577_122237472848024777_3827026612724875657_n-1024x768.jpg\" alt=\"\" class=\"wp-image-37820\" srcset=\"http:\/\/nitrainvest.sk\/wp-content\/uploads\/480650577_122237472848024777_3827026612724875657_n-1024x768.jpg 1024w, http:\/\/nitrainvest.sk\/wp-content\/uploads\/480650577_122237472848024777_3827026612724875657_n-300x225.jpg 300w, http:\/\/nitrainvest.sk\/wp-content\/uploads\/480650577_122237472848024777_3827026612724875657_n-600x450.jpg 600w, http:\/\/nitrainvest.sk\/wp-content\/uploads\/480650577_122237472848024777_3827026612724875657_n.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>We are in the final phase of the implementation of the Production and Storage Hall S, where the last paved areas are currently being concreted. This key stage will provide a stable and durable surface that will be used for efficient material handling and ensure smooth logistics throughout the space. The paved areas are designed&hellip;<\/p>\n","protected":false},"author":3,"featured_media":37820,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[76],"tags":[],"aioseo_notices":[],"_links":{"self":[{"href":"http:\/\/nitrainvest.sk\/en\/wp-json\/wp\/v2\/posts\/37894"}],"collection":[{"href":"http:\/\/nitrainvest.sk\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/nitrainvest.sk\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/nitrainvest.sk\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"http:\/\/nitrainvest.sk\/en\/wp-json\/wp\/v2\/comments?post=37894"}],"version-history":[{"count":1,"href":"http:\/\/nitrainvest.sk\/en\/wp-json\/wp\/v2\/posts\/37894\/revisions"}],"predecessor-version":[{"id":37896,"href":"http:\/\/nitrainvest.sk\/en\/wp-json\/wp\/v2\/posts\/37894\/revisions\/37896"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/nitrainvest.sk\/en\/wp-json\/wp\/v2\/media\/37820"}],"wp:attachment":[{"href":"http:\/\/nitrainvest.sk\/en\/wp-json\/wp\/v2\/media?parent=37894"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/nitrainvest.sk\/en\/wp-json\/wp\/v2\/categories?post=37894"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/nitrainvest.sk\/en\/wp-json\/wp\/v2\/tags?post=37894"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}